Teifi pre-restoration monitoring

TROLL_link_telemetryThe aim of this 2 year CCW-funded project is to establish a set of baseline conditions on the Afon Teifi at Tregaron Bog prior to the implementaion of a proposed river channel restoration scheme. Two telemetered water quality/flow monitoring stations have been established at the up- and downstream ends of the 1.5 km study reach and 12 groundwater monitoring boreholes have been drilled. In addition, topographical channel bed surveys and macrophyte surveys have been conducted to establsih a detailed database of the physical and biological characteristics of the reach prior to restoration.

Teifi_bankfull